Blue Rock completed renovations to the historic National Constitution Center Museum Store in Philadelphia.
Work for the 2,500-square-foot space included:
- Demolition of existing millwork, ceiling flag structure and floor
- Installing a new tile floor
- Installing new millwork throughout
- Painting throughout
- Installing new outlets and lighting
Construction took four weeks to complete.
The National Constitution Center is the first and only nonprofit, nonpartisan museum devoted to the most powerful vision of freedom ever expressed: the U.S. Constitution.
Located on Independence Mall in Historic Philadelphia, the birthplace of American freedom, the National Constitution Center illuminates constitutional ideals and inspires active citizenship through a state-of-the-art museum experience.
“I recently had the honor of project managing the refurbishment of Aramark’s store location in the National Constitution Center, Philadelphia, PA. The project scope was all inclusive from design & construction documentation through to implementation- a complete re-do of the space.
“We understood from inception that this was a high-profile project and that Fleetwood would need to partner wisely to succeed. We chose Blue Rock as our construction partner based on exceptional experiences we had working together on previous projects and our familiarity with the exceptional quality of their work.
“Cameron Barr, the Project Executive at Blue Rock was instrumental in helping establish and achieve the desired construction budget, incredibly helpful with technical expertise, addressing questions or supplying details the client had or needed and was always immensely supportive in ensuring the client was thrilled with the results.
“Cameron and the Blue Rock team worked through unanticipated changes and last-minute requests with superlative professionalism and adaptability, always exceeding expectations. The resultant work speaks for itself, visit the NCC Store!
“Lastly, this project was executed nearly flawless, exceptional quality delivered on budget and on schedule to the delight of Aramark and the NCC.”
Daniel Thompson,
Sr. Project Manager, Fleetwood Fixtures